KVM Replacement George's Dock Building Further Competition TEPAS 2 Lot 2 RM6098
Descrizione della gara
This procurement is for the supply, design, installation, maintenance and ongoing support of a new control room KVM solution to replace the aging ATEN KVM system currently installed in the George’s Dock Building Combined Control Centre (GDBCCC). This control centre is critical to the operation of the Mersey Tunnels and is the primary facility used by the Mersey Tunnels Police to monitor traffic flow through the tunnels as well as Control Room engineering staff who monitor the industrial controls systems. The GDBCCC is operational 24x7 and any solutions need to consider the availability requirement for operational uptime.
Non perdere la prossima gara
Veritra controlla ogni giorno tutti i portali degli appalti pubblici e ti invia le nuove gare per il tuo settore e la tua regione — via e-mail, mobile o direttamente nel tuo sistema. Primi 7 giorni gratis.
Prova gratisGare attive simili
- Leadership Development · 11 set 2026
- Mackintosh Illuminated - Standing Building Survey · 7 set 2026
- PS-26-170 - Proposed Alterations and Extension - 2 Woodbank Road, Crosshouse (PRJ0013295) · 10 set 2026
- Proposed Peatland Restoration - Altnaharra Phase 2 · 11 set 2026
- Lease of Multifunctional Printing, Scanning and Photocopying Machines · 18 ago 2026
- Delivery of a Welsh Medium Childcare Service within the city of Newport for children aged from 2 to · 11 set 2026