EST_MW_UHL Block G – 72 Inpatient Bed Ward Expansion at University Hospital Limerick
Beschreibung
The project comprises the vertical expansion of an existing 24-bed ward (Block G) building, which was constructed under emergency legislation during the COVID-19 pandemic and is located on the University Hospital Limerick campus, which is an acute hospital. The vertical expansion will provide 72 additional beds across three new ward levels, together with staff and ancillary accommodation, plant room at the fourth floor and part of the fifth floor, and additional vertical circulation, including 2 new stair cores and lifts with an overall floor area of circa 6,617 m2 inclusive of the plantroom area and all ancillary site development above and below ground. The works will take place within an operational campus adjacent to live 24
Unterlagen (2)
- UHL Bk. G (SAQ).zipzip
- c4t_8796869_1.xmlxml
Der Download der Unterlagen ist nach kostenloser Registrierung möglich — 7 Tage testen, ohne Karte.
Unterlagen erhaltenVerpassen Sie keine Ausschreibung mehr
Veritra durchsucht täglich alle Vergabeportale und sendet Ihnen neue Ausschreibungen für Ihre Branche und Region — per E-Mail, App oder direkt in Ihr System. Die ersten 7 Tage gratis.
Kostenlos testenÄhnliche aktive Ausschreibungen
- Phase 2 Construction of New Clubhouse and Dressing Rooms - Internal Finishes300 € · 14.09.2026
- WCCC26 260 Proposed Car Park Construction, An Rinn · 11.09.2026
- Dinish Bridge Refurbishment, Castletownbere Fishery Harbour Centre1 € · 11.09.2026
- HSE Estates SW Window Replacement and Maintenance in Cork University Hospital · 04.09.2026
- St. Cuan's College120 € · 18.09.2026
- GRETB LEV Systems Upgrade Project, GRETB Training Centres, Mervue Business Park, Mervue, Galway245 € · 11.09.2026