KVM Replacement George's Dock Building Further Competition TEPAS 2 Lot 2 RM6098
Opis zákazky
This procurement is for the supply, design, installation, maintenance and ongoing support of a new control room KVM solution to replace the aging ATEN KVM system currently installed in the George’s Dock Building Combined Control Centre (GDBCCC). This control centre is critical to the operation of the Mersey Tunnels and is the primary facility used by the Mersey Tunnels Police to monitor traffic flow through the tunnels as well as Control Room engineering staff who monitor the industrial controls systems. The GDBCCC is operational 24x7 and any solutions need to consider the availability requirement for operational uptime.
Zobraziť na zdrojovom portáli ↗
Nenechajte si ujsť ďalšie zákazky
Veritra denne prejde všetky portály verejného obstarávania a pošle vám nové zákazky pre váš odbor a región — e-mailom, do mobilu alebo rovno do vášho systému. Prvých 7 dní zadarmo.
Vyskúšať zadarmoPodobné aktívne zákazky
- Leadership Development · 11. 9. 2026
- Mackintosh Illuminated - Standing Building Survey · 7. 9. 2026
- PS-26-170 - Proposed Alterations and Extension - 2 Woodbank Road, Crosshouse (PRJ0013295) · 10. 9. 2026
- Proposed Peatland Restoration - Altnaharra Phase 2 · 11. 9. 2026
- Lease of Multifunctional Printing, Scanning and Photocopying Machines · 18. 8. 2026
- Delivery of a Welsh Medium Childcare Service within the city of Newport for children aged from 2 to · 11. 9. 2026