Mary Immaculate College - Tailteann T2 Building Gym
Opis zákazky
The full removal of the gym floor back to the original concrete slab, including the existing underfloor heating system, then new build-up of 55mm screed on new DPM. New high impact gym floor will then be done by others. Existing storage room to be converted into an office which involves new suspended ceiling, plasterboard walls, painting and skirting. Existing wall requires breaking through for a new window and door from the cardio area side. The large door to the gym will require removal, disposal and a new door fitted. The cardio area will have the existing two individual plasterboard and metal grid ceilings removed, then a new suspended ceiling fitted across the full room. Electrical works include the relocation of the existing distribution board from the corridor, into the new office and the removal and replacement of existing lighting. Mechanical works include new air conditioning works, including new outdoor units, new ducting
Dokumentácia (3)
- CFT 8801127 - drawings.zipzip
- CFT 8801127 - Tender Documents.zipzip
- c4t_8801127_1.xmlxml
Stiahnutie dokumentov je po bezplatnej registrácii — trial na 7 dní, bez platobnej karty.
Získať dokumentyZobraziť na zdrojovom portáli ↗
Nenechajte si ujsť ďalšie zákazky
Veritra denne prejde všetky portály verejného obstarávania a pošle vám nové zákazky pre váš odbor a región — e-mailom, do mobilu alebo rovno do vášho systému. Prvých 7 dní zadarmo.
Vyskúšať zadarmoPodobné aktívne zákazky
- Phase 2 Construction of New Clubhouse and Dressing Rooms - Internal Finishes300 € · 14. 9. 2026
- WCCC26 260 Proposed Car Park Construction, An Rinn · 11. 9. 2026
- Dinish Bridge Refurbishment, Castletownbere Fishery Harbour Centre1 € · 11. 9. 2026
- HSE Estates SW Window Replacement and Maintenance in Cork University Hospital · 4. 9. 2026
- St. Cuan's College120 € · 18. 9. 2026
- GRETB LEV Systems Upgrade Project, GRETB Training Centres, Mervue Business Park, Mervue, Galway245 € · 11. 9. 2026