KVM Replacement George's Dock Building Further Competition TEPAS 2 Lot 2 RM6098
Tender description
This procurement is for the supply, design, installation, maintenance and ongoing support of a new control room KVM solution to replace the aging ATEN KVM system currently installed in the George’s Dock Building Combined Control Centre (GDBCCC). This control centre is critical to the operation of the Mersey Tunnels and is the primary facility used by the Mersey Tunnels Police to monitor traffic flow through the tunnels as well as Control Room engineering staff who monitor the industrial controls systems. The GDBCCC is operational 24x7 and any solutions need to consider the availability requirement for operational uptime.
Don't miss the next tender
Veritra checks every public procurement portal daily and sends you new tenders for your sector and region — by email, mobile app, or straight into your system. First 7 days free.
Try for freeSimilar active tenders
- Leadership Development · 11 Sept 2026
- Mackintosh Illuminated - Standing Building Survey · 7 Sept 2026
- PS-26-170 - Proposed Alterations and Extension - 2 Woodbank Road, Crosshouse (PRJ0013295) · 10 Sept 2026
- Proposed Peatland Restoration - Altnaharra Phase 2 · 11 Sept 2026
- Lease of Multifunctional Printing, Scanning and Photocopying Machines · 18 Aug 2026
- Delivery of a Welsh Medium Childcare Service within the city of Newport for children aged from 2 to · 11 Sept 2026